Let us help at Build It Live
Claim your two free tickets here!In addition to the Building Regulations Fee that needs to be paid to the local Council, how much should I budget to have a designer/architect/structural engineer perform the activities needed to achieve Full Building Regulations approval (i.e. structural calculations for house superstructure, preparation of structural engineering drawings, submission of Building Regulations form etc.) for a new build 3 bedroom detached house of 200 sq m?
Architect’s fees vary quite a bit but typically for a budget of say around £300k -£400k (@ £1,500 to £2,000 per sqm) a fee for a full service would be around 7% to 9% of the total costs. The service up to building regulations accounts for 50% to 60% of the fee.
Engineer’s fees are usually separate and could easily be a few thousand, depending on the complexity of the structural design.
Julian Owen (Build It expert)