For this project, there were two key issues with the existing cottage:
Ke-design proposed to relocated the stairs as a glazed link between the existing and a 2 storey extension for a new kitchen / dining at ground, and new master bedroom with ensuite to the first. A glazed gable would frame the view of the valley.
Initially the planning officer had his reservations, but on a site visit, banged his head and suggested that the extension be made more modern.
When the client went for a SIP build, we had our reservations as connecting to the existing cottage there was no room for error. But it was spot on and the client was impressed with the speed in which the shell went up.
View more of the project here