Hi,
My electrician has buried an armoured electric cable supplying power to my new workshop and going into the main house. However he has dug out a (I suspect) legal depth and width hole for this job. Can I just fill this hole with concrete/cement? Or do I need to place some sort of bridging over the cable and then cover? Or should I leave the hole as an inspection chamber and use a manhole cover?
Hello Karl,
Thanks for your question. I have put this to our experts and will come back with an answer for you ASAP.
Best wishes,
Anamika Talwaria (Build It Features Editor)